Comparison of Reliability Measures
As for the LOLP, if the 110 MW unit (#2) fails, 10 MW of load isn’t served. If it doesn’t fail, all of the load is served \ the LOLP is ...
The expected value of the unserved energy (EUE) is the probability weighted sum of all possible unserved energies. The number of possibilities is ...
2 (the two outage states of unit #2).