Solution Analysis (cont.)
Yet another is to run only # 2 (shut down # 1).
This costs C2(125 MW) which is:
0.004(125)2 + 2.6(125) + 80
= 467.50 $/h.
Previous slide
Next slide
Back to first slide
View graphic version