Solution Analysis (cont.)
What’s this strategy’s production cost?
It’s C1(57.14 MW) + C2(67.86 MW).
= 0.01(57.14)2 + 2.0(57.14) + 100 + 0.004(67.86)2 + 2.6(67.86) + 80
= 246.93 $/h + 274.86 $/h.
= 521.79 $/h.
Previous slide
Next slide
Back to first slide
View graphic version