So what’s the economic operation strategy for the 125 MW load?
P1 @ 0.2857PL + 21.43 MW
P1 @ 0.2857(125) + 21.43 @ 57.14 MW
P2 @ 0.7143PL - 21.43 MW
P2 @ 0.7143(125) - 21.43 @ 67.86 MW