Solution Strategy (cont.)
So what’s the logical conclusion?
Split the load between the units in such a way that their l’s are equal.
Or, stated mathematically: P1 + P2 = PL (serve the load) and
l1(P1) = l2(P2) (split the load economically).
Previous slide
Next slide
Back to first slide
View graphic version