Two-unit, variable l economic dispatch
Determine the economic dispatch policy for a two-unit power system having the following production cost functions and operating ranges:
C1(P1) = 0.01 + 2P1 + 100 (in $/h) 25 MW £ P1 £ 150 MW
C2(P2) = 0.004 + 2.6P2 + 80 (in $/h) 30 MW £ P2 £ 200 MW
What is the most economic way to operate the units if the load is 125 MW?